|
1
|
NOZZLE ASSEMBLY: STAGE-1 S1N , COMPLETE ASSEMBLY CONTAINS 2SEGMENTS ,GE PART #137E2027G001 REPAIR&RETURN EXPORT VIDE
|
PRAGATI POWER CORPORATION LTD
|
N/A
|
2021-11-12
|
UNITED STATES
|
1.00 SET
|
|
2
|
DLN II COATED LINER ASSEMBLY , GE PART # 586E2460G001-3 REPAIR & RETURN EXPORT VIDE SB.NO.2968565-07.07.21
|
PRAGATI POWER CORPORATION LTD
|
N/A
|
2021-11-12
|
UNITED STATES
|
1.00 SET
|
|
3
|
FUEL NOZZLE ASSEMBLY , GAS ONLY , GE PART # 141E7431G003 REPAIR & RETURN EXPORT VIDE SB.NO.2968565-07.07.21
|
PRAGATI POWER CORPORATION LTD
|
N/A
|
2021-11-12
|
UNITED STATES
|
1.00 SET
|
|
4
|
DLN II CAP UNCOATED ASSEMBLY: COMPLETE ASSEMBLY CONTAINS 18EC , GE PART #114E4099G013 REPAIR&RETURN EXPORT VIDE SB.NO.2
|
PRAGATI POWER CORPORATION LTD
|
N/A
|
2021-11-12
|
UNITED STATES
|
1.00 SET
|
|
5
|
STAGE#1 BUCKET ASSEMBLY GE PART#109E5305P001 PACK IN BOXSL #S1B-M1&S1B-M2 REP.&RETURN VIDE SB.NO.9397413-16.03.21
|
PRAGATI POWER CORPORATION LTD
|
N/A
|
2021-11-10
|
UNITED STATES
|
1.00 SET
|
|
6
|
STAGE#2 BUCKET ASSEMBLY TIL 2055 IMPLEMENTATION S2 BUCKETS GE PART# 119E6182P001 PACK IN BOX SL# S2B-M1 TO SL # S2B-M
|
PRAGATI POWER CORPORATION LTD
|
N/A
|
2021-11-10
|
UNITED STATES
|
1.00 SET
|
|
7
|
BLOWER CLOCK WISE, PART NO.010-0429 (PART FOR GAS TURBINE)
|
PRAGATI POWER CORPORATION LTD,
|
ILLINOIS BLOWER INC.
|
2016-10-07
|
UNITED STATES
|
1.00 PCS
|