|
1
|
MINERAL DE HIERRO A GRANEL (TIPO CHANCADO) CONTRATO: JM-2026-3 FE:62.24%, H2O: 0.31089%
|
N/A
|
JUNEFIELD MINING S.A.C.
|
2026-02-14
|
PERU
|
23235680 Kgs
|
23163.44 KG
|
|
2
|
MINERAL DE HIERRO A GRANEL (TIPO FINO) CONTRATO: JM-2026-2 FE:57.70%, H2O: 1.26635%
|
N/A
|
JUNEFIELD MINING S.A.C.
|
2026-01-03
|
PERU
|
7018463 Kgs
|
6929.58 KG
|
|
3
|
MINERAL DE HIERRO A GRANEL (TIPO CHANCADO) CONTRATO: JM-2026-1 FE:62.14%, H2O: 0.33481%,
|
N/A
|
JUNEFIELD MINING S.A.C.
|
2026-01-03
|
PERU
|
23047537 Kgs
|
22970.37 KG
|
|
4
|
MINERAL DE HIERRO A GRANEL (TIPO CHANCADO) CONTRATO: JM-2025-12 FE:61.05%, H2O: 0.50143%
|
N/A
|
JUNEFIELD MINING S.A.C.
|
2025-12-03
|
PERU
|
31022230 Kgs
|
30866.68 KG
|
|
5
|
MINERAL DE HIERRO A GRANEL (TIPO FINO) CONTRATO:JM-2025-11 FE:58.33%,, H2O:1.67000%
|
N/A
|
JUNEFIELD MINING S.A.C.
|
2025-10-01
|
PERU
|
6029142 Kgs
|
5928.46 KG
|
|
6
|
MINERAL DE HIERRO A GRANEL (TIPO CHANCADO) CONTRATO:JM-2025-10 FE:61.15%, H2O:0.61666%,
|
N/A
|
JUNEFIELD MINING S.A.C.
|
2025-10-01
|
PERU
|
19354348 Kgs
|
19235 KG
|
|
7
|
MINERAL DE HIERRO A GRANEL (TIPO CHANCADO) CONTRATO:JM-2025-09
|
N/A
|
JUNEFIELD MINING S.A.C.
|
2025-09-02
|
PERU
|
30912464 Kgs
|
30711.33 KG
|
|
8
|
MINERAL DE HIERRO A GRANEL (TIPO CHANCADO) HIERRO 61% CONTRATO: JM-2024-04
|
N/A
|
JUNEFIELD MINING S.A.C.
|
2024-05-28
|
PERU
|
38003120 Kgs
|
38003120.00 KG
|
|
9
|
MINERAL DE HIERRO A GRANEL (TIPO CHANCADO) HIERRO: 61% CONTRATO: JM- 2024-003
|
N/A
|
JUNEFIELD MINING S.A.C.
|
2024-04-19
|
PERU
|
36532030 Kgs
|
36532030.00 KG
|
|
10
|
MINERAL DE HIERRO A GRANEL (TIPO CHANCADO) FE:61% CONTRATO: JM- 2024-02
|
N/A
|
JUNEFIELD MINING S.A.C.
|
2024-02-23
|
PERU
|
38514690 Kgs
|
38514690.00 KG
|